Signal · Supplier & Corporate Risk
Fortum Sverige AB: unavailability
What the source reported
Source-reportedNord Pool UMM: Fortum Sverige AB reports unavailability. Remarks: Ljusnan river. Installed production capacity 844 MW. Grid failure witch affect multiple stations. Approximatley 255-270 MW unavailable..
- Publication
- Nord Pool Urgent Market Messages (UMM) · Stock Exchange/Regulatory Announcements
- Published
- 23rd October 2026
- Original report
- umm.nordpoolgroup.com
ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.
What ProcIntel recorded
ProcIntel-derived- Category
- Supplier & Corporate Risk
- Geography
- Norway
- Organisations
- None identified
- Collected
- 23rd October 2026 · 06:27
Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.
A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.
Initial Significance Material (46.0/100). Strongest contributor: Procurement Impact (21.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence High (68.75/100, data sufficiency: Sufficient, Sufficient via authoritative_origin). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Corroboration (2.5/25 points).
- Strongest contributor
- Procurement Impact
- Limiting factor
- Geographic Breadth