← Signals

Signal · Supplier & Corporate Risk

SSE Generation Limited: Steam Turbine HIP Inspection and Repair. Schedule is best estimate at this stage. -- Great Island (IE)

Nord Pool Urgent Market Messages (UMM) Authoritative source Published 14th October 2026 Norway

Open original report umm.nordpoolgroup.com

What the source reported

Source-reported

Nord Pool UMM: SSE Generation Limited reports Steam Turbine HIP Inspection and Repair. Schedule is best estimate at this stage. for Great Island. Unavailable 464 mw of 464 mw from 2027-10-10 23:00:00 to 2027-12-10 00:00:00. Remarks: Planned Outage.

Publication
Nord Pool Urgent Market Messages (UMM) · Stock Exchange/Regulatory Announcements
Published
14th October 2026
Original report
umm.nordpoolgroup.com

ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.

What ProcIntel recorded

ProcIntel-derived
Category
Supplier & Corporate Risk
Geography
Norway
Organisations
None identified
Collected
14th October 2026 · 11:08

Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.

A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.

Significance 2 · Moderate
Confidence 3 · Moderate

Initial Significance Moderate (29.0/100). Strongest contributor: Procurement Impact (21.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Moderate (51.5/100, data sufficiency: Partial). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Corroboration (2.5/25 points).

Strongest contributor
Procurement Impact
Limiting factor
Geographic Breadth