← Signals

Signal · Supplier & Corporate Risk

Göteborg Energi AB: Due to unavailable emergency power. Annual maintenance GT1 and GT2

Nord Pool Urgent Market Messages (UMM) Authoritative source Published 28th September 2026 Norway

Open original report umm.nordpoolgroup.com

What the source reported

Source-reported

Nord Pool UMM: Göteborg Energi AB reports Due to unavailable emergency power. Annual maintenance GT1 and GT2. Remarks: Maximum Capacity at primary fuel (gas) is 260 MW and maximum capacity at reserve fuel (Oil) is 171 MW.

Publication
Nord Pool Urgent Market Messages (UMM) · Stock Exchange/Regulatory Announcements
Published
28th September 2026
Original report
umm.nordpoolgroup.com

ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.

What ProcIntel recorded

ProcIntel-derived
Category
Supplier & Corporate Risk
Geography
Norway
Organisations
None identified
Collected
28th September 2026 · 06:55

Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.

A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.

Significance 2 · Moderate
Confidence 3 · Moderate

Initial Significance Moderate (35.0/100). Strongest contributor: Procurement Impact (27.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Moderate (51.5/100, data sufficiency: Partial). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Corroboration (2.5/25 points).

Strongest contributor
Procurement Impact
Limiting factor
Geographic Breadth