← Signals

Signal · Supplier & Corporate Risk

LITGRID AB: Capacity calculated based on principles defined in All Baltic CCR TSOs’ Common Capacity Calculation Methodology for Long-term Time Frames in Accordance with Article 10(1) of the Commission Regulation (EU) 2016/1719 of 26 September 2016 Establishing a Guideline on Forward Capacity Allocat

Nord Pool Urgent Market Messages (UMM) Authoritative source Published 27th September 2026 Norway

Open original report umm.nordpoolgroup.com

What the source reported

Source-reported

Nord Pool UMM: LITGRID AB reports Capacity calculated based on principles defined in All Baltic CCR TSOs’ Common Capacity Calculation Methodology for Long-term Time Frames in Accordance with Article 10(1) of the Commission Regulation (EU) 2016/1719 of 26 September 2016 Establishing a Guideline on Forward Capacity Allocation (see: https://umm.nordpoolgroup.com/#/messages/0f4ec130-b850-4fb8-852d-17a3ac0d7def/1). for LT → LV. Unavailable 22 mw of 1272 mw from 2026-09-28 22:00:00 to 2026-10-02 21:59:00. Remarks: Capacities will be recalculated on daily basis. For day-ahead additional limitations will be applied due to allocations in Baltic Balancing Capacity market considering Baltic CCR Methodology on Market.

Publication
Nord Pool Urgent Market Messages (UMM) · Stock Exchange/Regulatory Announcements
Published
27th September 2026
Original report
umm.nordpoolgroup.com

ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.

What ProcIntel recorded

ProcIntel-derived
Category
Supplier & Corporate Risk
Geography
Norway
Organisations
None identified
Collected
27th September 2026 · 07:01

Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.

A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.

Significance 2 · Moderate
Confidence 3 · Moderate

Initial Significance Moderate (31.0/100). Strongest contributor: Procurement Impact (21.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Moderate (57.5/100, data sufficiency: Partial). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Corroboration (2.5/25 points).

Strongest contributor
Procurement Impact
Limiting factor
Geographic Breadth