Signal · Supplier & Corporate Risk
Tarvisio (IT) / Arnoldstein (AT) interruption (TAG, exit): 32,009,580 kWh/h (2026-09-27T06:00:00+02:00)
What the source reported
Source-reportedTarvisio (IT) / Arnoldstein (AT) interruption (TAG, exit): 32,009,580 kWh/h for 2026-09-27T06:00:00+02:00. Geography: EU gas network. Interruption type: Planned. Capacity type: Firm. Period 2026-09-27T06:00:00+02:00 to 2026-09-27T07:00:00+02:00.
- Publication
- ENTSOG Transparency Platform - Capacity Interruptions · Government/Regulator
- Published
- 27th September 2026
- Original report
- transparency.entsog.eu
ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.
What ProcIntel recorded
ProcIntel-derived- Category
- Supplier & Corporate Risk
- Geography
- Belgium (EU-wide)
- Organisations
- None identified
- Collected
- 27th September 2026 · 06:59
Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.
A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.
Initial Significance Moderate (26.0/100). Strongest contributor: Procurement Impact (21.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Low (39/100, data sufficiency: Insufficient). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Specificity (0.0/20 points). Capped at 39 (Low) -- insufficient structured evidence to support a higher Confidence reading, regardless of source authority.
- Strongest contributor
- Procurement Impact
- Limiting factor
- Geographic Breadth