← Signals

Signal · Supplier & Corporate Risk

Tarvisio (IT) / Arnoldstein (AT) interruption (TAG, exit): 768,229,920 kWh/d (2026-09-26T04:00:00+02:00)

ENTSOG Transparency Platform - Capacity Interruptions Authoritative source Published 26th September 2026 Belgium (EU-wide)

Open original report transparency.entsog.eu

What the source reported

Source-reported

Tarvisio (IT) / Arnoldstein (AT) interruption (TAG, exit): 768,229,920 kWh/d for 2026-09-26T04:00:00+02:00. Geography: EU gas network. Interruption type: Planned. Capacity type: Firm. Period 2026-09-26T04:00:00+02:00 to 2026-09-27T04:00:00+02:00.

Publication
ENTSOG Transparency Platform - Capacity Interruptions · Government/Regulator
Published
26th September 2026
Original report
transparency.entsog.eu

ProcIntel stores what the source published in its feed — a headline, a summary and a link. It does not store or reproduce the full article.

What ProcIntel recorded

ProcIntel-derived
Category
Supplier & Corporate Risk
Geography
Belgium (EU-wide)
Organisations
None identified
Collected
26th September 2026 · 13:30

Initial assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.

A provisional, automatically computed reading of this individual Signal, before Event extraction or human review. Not a final rating.

Significance 2 · Moderate
Confidence 2 · Low

Initial Significance Moderate (26.0/100). Strongest contributor: Procurement Impact (21.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Low (39/100, data sufficiency: Insufficient). Strongest contributor: Source Authority (40.0/40 points). Limiting factor: Specificity (0.0/20 points). Capped at 39 (Low) -- insufficient structured evidence to support a higher Confidence reading, regardless of source authority.

Strongest contributor
Procurement Impact
Limiting factor
Geographic Breadth