← Back to all Signals

‎MIS wins SAR 80.9M project with CMA

Source
Argaam - Company Disclosures
Source link
https://www.argaam.com/en/article/articledetail/id/1925563
Published
2026-08-03 17:51:00
Discovered by ProcIntel
2026-08-03 15:26:58
Category
Supplier Risk
Geography
Saudi Arabia, UAE
Organisations
Review status
Pending
Record type
REAL

Summary

‎<p><img src="https://argaamplus.s3.amazonaws.com/f494005f-9eb3-4c86-af19-6b87c74538f6.png" ></p> <p class="ckeCaption" >Logo ofAl Moammar Information Systems Co. (MIS)</p> <hr> <p >Al Moammar Information Systems Co. (<a href="https://www.argaam.com/en/tadawul/tasi/mis" target="_blank">MIS</a>) won a project by the Capital Market Authority (CMA) worth SAR 80.88 million, including VAT.</p> <p ></p> <p >The project aims to deliver comprehensive managed services for the operation and enhancement of IT services. The scope of the work covers the operation and support of business applications, the provision of flexible development capacity for continuous application enhancement, while delivering project governance and service delivery management, IT service desk operations, and Enterprise Operation Center (EOC) services, the company said in a statement to <strong>Tadawul</strong>.</p> <p ></p> <p >MIS will also oversee the management and operation of the CMA’s IT infrastructure, including operating systems and virtualization platforms, network and network security, backup, storage and recovery services, database administration, and systems administration, ensuring business continuity, operational efficiency, and the achievement of the required service availability and performance levels, it added.</p> <p ></p> <p >The project award was announced today, Aug. 3, said the company, adding that the contract is expected to be signed on Sept. 3. There are no related parties involved in the project.</p>

Procurement Relevance Gate

PASS — score 31.6/100 — evaluated 2026-08-03 15:26:58
Passed on: capacity_production_disruption, price_availability_leadtime_demand, geographic_exposure (score 31.6/100, threshold 20.0).
  • capacity_production_disruption (weight 12) — matched on "capacity"
  • price_availability_leadtime_demand (weight 10) — matched on "availability"
  • geographic_exposure (weight 8) — matched on "2 linked geographies"

Initial Signal Assessment ProcIntel's automatic, provisional read of this individual Signal -- Initial Significance and Initial Confidence, computed deterministically before any Event extraction or human review.

A provisional, automatically-computed reading of this individual Signal, before Event extraction or human review. Not a final rating.

Initial Significance
3 · Material (41.0/100)
Initial Confidence
1 · Very Low (18.5/100)
Data sufficiency Whether enough structured evidence exists to trust this Signal's Initial Confidence reading. 'Sufficient' has no cap; 'Partial' and 'Insufficient' cap Confidence until more evidence is available; 'Not Assessed' means the Signal did not pass the Relevance Gate.
Partial
Strongest contributor
Procurement Impact
Limiting factor
Geographic Breadth

Initial Significance Material (41.0/100). Strongest contributor: Procurement Impact (27.0/30 points). Limiting factor: Geographic Breadth (0.0/10 points). Initial Confidence Very Low (18.5/100, data sufficiency: Partial). Strongest contributor: Source Authority (12.0/40 points). Limiting factor: Corroboration (2.5/25 points).

  • No likely Event type matched; a low contextual baseline was applied.
  • no matched Event type
  • no actor entities (only attribution/metadata, if any)
  • no actor content-derived geography
  • single source only
  • Entities were mentioned as context or document attribution rather than as actors in the reported development, so they did not increase Initial Confidence.
  • Only source-level geography metadata was available.
  • Source metadata did not contribute to Initial Confidence.
  • 1 distinct hedging pattern(s) matched (capped at 20).

Methodology signal_scoring_v1 — calculated 2026-08-03 16:30:19.