Oman launches EPC tender for Ras Markaz oil park expansion
PRI: 5 — MINIMAL Base risk 21/100 × Low confidence multiplier (0.45) × impact-direction multiplier (0.50). Highest contributor: Significance 40/100, normalised to this factor's 40-point cap (+16 of 40). Limiting factor: Linked-entity criticality 0/100, normalised to this factor's 30-point cap -- DATA QUALITY WARNING: all linked entities data insufficient (30 points below its maximum). DATA QUALITY WARNING: all linked entities data insufficient.
Confidence multiplier Confidence limits the final PRI when evidence is uncertain. A severe but weakly supported claim cannot reach the highest PRI bands.: 0.45 (Low) · Calculated 2026-08-01 12:59:38 (vv1).
Full contribution breakdown
- Procurement Impact: 16 / 40 — Significance 40/100, normalised to this factor's 40-point cap
- Corroboration: 5 / 15 — A single event -- not yet corroborated by a separate clustered event (neutral baseline, not a penalty)
- Entity Criticality: 0 / 30 — Linked-entity criticality 0/100, normalised to this factor's 30-point cap -- DATA QUALITY WARNING: all linked entities data insufficient
- Geographic Regulatory: 0 / 15 — 0 distinct content-linked geography/geographies
- Event type
- Major contract award
- UUID
- 28fa5c80-4ffe-41c7-b3b7-c8f5614aa476
- Editorial review status
- Pending (ProcIntel's own review of this record)
- Event lifecycle
- Active (the real-world state of the situation — a separate concept from review status above)
- Significance
-
3 · Material
- This type of disruption is typically contained/limited for procurement.
- No specific geography identified yet.
- Linked to 2 tracked entities.
- Assessed time horizon: Short-term.
- Confidence
-
2 · Low
(distinct from each article link's own extraction confidence below)
- Reported only by secondary sources so far — no primary/official confirmation yet.
- Reported by a single source so far — not yet independently corroborated.
- Some key facts (e.g. exact date) are still missing or unconfirmed.
- Evidence was last updated within the last month.
- Impact direction
- Positive (provisional default — not yet reviewed)
- Occurred at
- Not yet established (no explicit date was tightly bound to the matched event text)
- Record type
- REAL
Source Facts
MUSCAT: Oman has launched the engineering, procurement and construction (EPC) tender process for the next phase of development of the Ras Markaz Crude Oil Park, inviting qualified...
Linked Signals
| Published | Headline | Source | Matched text | Extraction confidence | Method |
|---|---|---|---|---|---|
| 2026-07-29 10:24:52 | Oman launches EPC tender for Ras Markaz oil park expansion | Oman Observer - Business | epc tender | 95.0 | high precision phrase |
Linked Entities
| Entity | Type | Link method | Confidence | Source article |
|---|---|---|---|---|
| Crude Oil | Commodity | reused entity extraction | 75.0 | article |
| Oman | Country | reused entity extraction | 95.0 | article |
Spend Categories
No spend categories linked yet
Review History
| Date | Action | Previous | New | Reviewer | Note |
|---|---|---|---|---|---|
| 2026-08-01 06:42:45 | Created | — | Major contract award: 'Oman launches EPC tender for Ras Markaz oil park expansion' (lifecycle=Active) | Deterministic v1 extractor | — |
| 2026-08-01 06:42:45 | Article Linked | — | source_item #479 | — | — |
| 2026-08-01 06:42:45 | Significance Changed | None | 3 | — | — |
| 2026-08-01 06:42:45 | Confidence Changed | None | 2 | — | — |
| 2026-08-01 12:59:38 | Pri Recalculated | score=None, band=None | score=5, band='Minimal' | Stage 9.6 production backfill | PRI: 5 — MINIMAL Base risk 21/100 × Low confidence multiplier (0.45) × impact-direction multiplier (0.50). Highest contributor: Significance 40/100, normalised to this factor's 40-point cap (+16 of 40). Limiting factor: Linked-entity criticality 0/100, normalised to this factor's 30-point cap -- DATA QUALITY WARNING: all linked entities data insufficient (30 points below its maximum). DATA QUALITY WARNING: all linked entities data insufficient. |