← Back to Events

Rock Tech Lithium secures 100,000‑tonne Transamine pact

ProcIntel Risk Index (PRI) PRI indicates how much procurement risk attention a canonical event warrants, based on its potential impact, corroboration, linked-entity criticality, geographic or regulatory exposure, and confidence in the available evidence.6 · Minimal Freshness: Ageing Shows how recently the evidence supporting the event was updated. Freshness is displayed separately and does not automatically reduce PRI.

PRI: 6 — MINIMAL Base risk 27/100 × Low confidence multiplier (0.45) × impact-direction multiplier (0.50). Highest contributor: Significance 40/100, normalised to this factor's 40-point cap (+16 of 40). Limiting factor: Significance 40/100, normalised to this factor's 40-point cap (24 points below its maximum).

Confidence multiplier Confidence limits the final PRI when evidence is uncertain. A severe but weakly supported claim cannot reach the highest PRI bands.: 0.45 (Low) · Calculated 2026-08-01 12:59:38 (vv1).

Full contribution breakdown
  • Procurement Impact: 16 / 40 — Significance 40/100, normalised to this factor's 40-point cap
  • Corroboration: 5 / 15 — A single event -- not yet corroborated by a separate clustered event (neutral baseline, not a penalty)
  • Entity Criticality: 6 / 30 — Linked-entity criticality 20/100, normalised to this factor's 30-point cap
  • Geographic Regulatory: 0 / 15 — 0 distinct content-linked geography/geographies
Event type
Major contract award
UUID
b7b4de74-2581-4aa3-91dd-408f325e9c7f
Editorial review status
Pending (ProcIntel's own review of this record)
Event lifecycle
Active (the real-world state of the situation — a separate concept from review status above)
Significance
3 · Material
  • This type of disruption is typically contained/limited for procurement.
  • No specific geography identified yet.
  • Linked to 3 tracked entities.
  • Assessed time horizon: Short-term.
Confidence
2 · Low (distinct from each article link's own extraction confidence below)
  • Reported only by secondary sources so far — no primary/official confirmation yet.
  • Reported by a single source so far — not yet independently corroborated.
  • Some key facts (e.g. exact date) are still missing or unconfirmed.
  • Evidence was last updated within the last month.
Impact direction
Positive (provisional default — not yet reviewed)
Occurred at
Not yet established (no explicit date was tightly bound to the matched event text)
Record type
REAL

Source Facts

Offtake agreement includes a framework for a development prepayment facility of up to $80 million to support the Georgia Lake project.

Linked Signals

PublishedHeadlineSourceMatched textExtraction confidenceMethod
2026-07-28 21:00:00 Rock Tech Lithium secures 100,000‑tonne Transamine pact Mining.com offtake agreement 95.0 high precision phrase

Linked Entities

EntityTypeLink methodConfidenceSource article
Lithium Commodity reused entity extraction 75.0 article
Rock Tech Lithium Inc. Company reused entity extraction 75.0 article
Global Region reused entity extraction 95.0 article

Spend Categories

No spend categories linked yet

Spend categories are linked by a reviewer, not assigned automatically.

Review History

DateActionPreviousNewReviewerNote
2026-07-31 13:57:03 Created Major contract award: 'Rock Tech Lithium secures 100,000‑tonne Transamine pact' (lifecycle=Active) Deterministic v1 extractor
2026-07-31 13:57:03 Article Linked source_item #241
2026-07-31 13:57:03 Significance Changed None 3
2026-07-31 13:57:03 Confidence Changed None 2
2026-08-01 12:59:38 Pri Recalculated score=None, band=None score=6, band='Minimal' Stage 9.6 production backfill PRI: 6 — MINIMAL Base risk 27/100 × Low confidence multiplier (0.45) × impact-direction multiplier (0.50). Highest contributor: Significance 40/100, normalised to this factor's 40-point cap (+16 of 40). Limiting factor: Significance 40/100, normalised to this factor's 40-point cap (24 points below its maximum).