← Back to Events
CONSOLIDATED — this event was merged into event #19 as a duplicate report of the same real-world occurrence. This record and its history are preserved for reference, not deleted.

Apple Forecasts Slowing Growth Due To Chip Shortages

ProcIntel Risk Index (PRI) PRI indicates how much procurement risk attention a canonical event warrants, based on its potential impact, corroboration, linked-entity criticality, geographic or regulatory exposure, and confidence in the available evidence. — historical only (this event is merged, so PRI is not shown as current customer-facing intelligence, but its calculation history below is preserved).14 · Minimal Freshness: Ageing Shows how recently the evidence supporting the event was updated. Freshness is displayed separately and does not automatically reduce PRI. Shows whether all structured inputs needed for the PRI are sufficiently assessed. Incomplete Entity Criticality data is disclosed rather than silently treated as low risk. DATA QUALITY WARNING

PRI: 14 — MINIMAL Base risk 30/100 × Low confidence multiplier (0.45). Highest contributor: Significance 50/100, normalised to this factor's 40-point cap (+20 of 40). Limiting factor: Linked-entity criticality 0/100, normalised to this factor's 30-point cap -- DATA QUALITY WARNING: all linked entities data insufficient (30 points below its maximum). DATA QUALITY WARNING: all linked entities data insufficient.

Confidence multiplier Confidence limits the final PRI when evidence is uncertain. A severe but weakly supported claim cannot reach the highest PRI bands.: 0.45 (Low) · Calculated just now (vv1).

Full contribution breakdown
  • Procurement Impact: 20 / 40 — Significance 50/100, normalised to this factor's 40-point cap
  • Corroboration: 10 / 15 — 2 corroborating event(s) in this event's cluster
  • Entity Criticality: 0 / 30 — Linked-entity criticality 0/100, normalised to this factor's 30-point cap -- DATA QUALITY WARNING: all linked entities data insufficient
  • Geographic Regulatory: 0 / 15 — 0 distinct content-linked geography/geographies
Event type
Supply shortage
UUID
ae26ecc2-7d8d-4468-b739-f864a74e909f
Editorial review status
Pending (ProcIntel's own review of this record)
Event lifecycle
Breaking (the real-world state of the situation — a separate concept from review status above)
Significance
3 · Material
  • This type of disruption typically has a moderate procurement impact.
  • No specific geography identified yet.
  • Linked to 3 tracked entities.
  • Assessed time horizon: Short-term.
Confidence
2 · Low (distinct from each article link's own extraction confidence below)
  • Reported only by secondary sources so far — no primary/official confirmation yet.
  • Reported by a single source so far — not yet independently corroborated.
  • Some key facts (e.g. exact date) are still missing or unconfirmed.
  • Evidence was last updated within the last month.
Impact direction
Negative (provisional default — not yet reviewed)
Occurred at
Not yet established (no explicit date was tightly bound to the matched event text)
Record type
REAL

Source Facts

(No summary text was provided by the source feed.)

Linked Signals

PublishedHeadlineSourceMatched textExtraction confidenceMethod
2026-07-31 15:51:40 Apple Forecasts Slowing Growth Due To Chip Shortages Yahoo Finance News chip shortages 95.0 high precision phrase

Linked Entities

EntityTypeLink methodConfidenceSource article
Apple Inc. Company reused entity extraction 75.0 article
United States Country reused entity extraction 95.0 article
Global Region reused entity extraction 95.0 article

Spend Categories

No spend categories linked yet

Spend categories are linked by a reviewer, not assigned automatically.

Review History

DateActionPreviousNewReviewerNote
2026-07-31 16:54:17 Created Supply shortage: 'Apple Forecasts Slowing Growth Due To Chip Shortages' (lifecycle=Breaking) Deterministic v1 extractor
2026-07-31 16:54:17 Article Linked source_item #1240
2026-07-31 16:54:17 Significance Changed None 3
2026-07-31 16:54:17 Confidence Changed None 2
2026-08-01 06:42:23 Merged Into event #19 Jack Stage 8.15B Section 10: same underlying Apple chip-shortage guidance-cut story, reported independently by The Straits Times (02:05) and Investors.com/Yahoo Finance (15:51) on the same day. Event #30 (Samsung) was reviewed against the same checklist and correctly stays separate -- different company, no shared specific entity.